Revista Presei PeScurt.ro
Actualizat Sâmbătă la ora: 18:58:15
RSS Feed 

Justiție

Stiri
 

All 120 km of the Arad – Oradea Expressway, covered by contracts

Cristian Pistol, general director of CNAIR, announces the signing of the contract for the execution of Lot 3 of the Arad-Oradea Expressway. It is the last contract covering the 120.47 km of this strategic connection between the two cities.

Continuarea pe: Mediafax
Articole corelate